Parking garages & decks
Parking Garage & Deck Coatings in Toronto
Road salt, meltwater and freeze-thaw cycles break down unprotected parking structures fast. Hardbond installs penetrating sealers, traffic coatings and line marking that keep water and chlorides out of the slab and keep drivers and pedestrians safe.
Zone by zone
Protecting the concrete, not just coating it
Road salt and water corrode the rebar inside parking structures. The right membrane in the right place stops that, and the repairs that follow.
Drive aisles
Traffic-bearing membranes with a wear layer that handles tires, salt and freeze-thaw cycles.
Ramps
Heavy-texture, slip-resistant finishes for grip in rain, slush and ice.
Cracks & joints
Cracks and expansion joints sealed and spalls repaired before the membrane goes on. See concrete repair.
Markings
Stalls, arrows and pedestrian routes restriped after the coating. See line striping and deck waterproofing.
What parking structures need
Protection from salt, water and wear
We look at exposure, traffic and drainage before recommending a system for each level, ramp and drive aisle.
Penetrating sealers
Silane and siloxane sealers block water and chlorides without changing how the concrete looks.
Traffic coatings
Waterproof, flexible membranes for decks and ramps over occupied space below.
Line marking
Stall lines, arrows, crosswalks and accessible spaces repainted as part of the project.
Crack & joint repair
Cracks routed and sealed and expansion joints rebuilt so water stops getting into the slab.
For property managers
Phased so the garage stays open
We work level by level or section by section, coordinate closures with your tenants, and schedule noisy work outside peak hours.
Each phase and reopening time is set out in a written schedule you can share with your tenants.
How a project runs
From site visit to handover
One project lead from the first walkthrough to the warranty paperwork, with the schedule planned around your operations.
01
Site assessment
We walk the space, check slab condition and moisture, and ask about traffic, chemicals and how much downtime you can allow.
02
Written proposal
A fixed quote naming the system, thickness, schedule and warranty, ready for your facility team or GC.
03
Prep & install
Diamond grinding, crack and joint repair, then installation, phased and scheduled for nights or weekends where needed.
04
Walkthrough
Final inspection with your team, care instructions and the warranty in writing.
Why facility teams choose Hardbond
Low risk to hire
A floor that fails costs far more than the floor. Here is what stands behind every Hardbond quote.
WSIB & fully insured
Active WSIB clearance and $5 million commercial liability coverage, sent with every proposal.
Written warranty
A 3-year written commercial warranty, stated in the contract, on every system we install.
No shutdown required
Phased and weekend installs, with overnight work by arrangement, so your floor and your team keep working.
Proven systems
Commercial systems from manufacturers including Sika, Mapei, Ardex, Tremco and Sherwin-Williams, installed to each manufacturer's specification.
Proven on large projects
Recent Hardbond projects
More than 1.1 million sq ft of flooring completed since 2021, for venues, dealerships, clinics and commercial spaces across Ontario and abroad.
60,000 sq ft
Go-kart and anti-slip pedestrian flooring for K1 Speed's indoor karting venue.
St. Catharines, ON · 2025
45,000 sq ft
Polymer flake flooring for a trampoline and entertainment venue.
Scarborough, ON · 2025
15,000 sq ft
Seamless polyurethane flooring for a plastic surgery clinic.
Santo Domingo, Dominican Republic · 2026
1.1M+ sq ft
Commercial and industrial flooring completed since 2021, backed by a written 3-year warranty.
Questions
Before you call
Straight answers to what facility managers ask us most.
-
Commercial epoxy starts at $2.75 per sq ft and concrete polishing at $2.50 per sq ft, with standard surface preparation included. Final pricing depends on the system, slab condition and size of the area, and extensive repairs are quoted separately. Every quote is fixed and in writing after a free site assessment.
-
Yes. We phase large floors in sections and schedule nights and weekends so your team keeps working.
-
Most exposed parking decks in the GTA benefit from resealing every few years, depending on traffic and salt exposure. We can inspect the structure and recommend a maintenance schedule.
-
Yes. We phase the work by level or section so most stalls stay in use, and coordinate closures with your property team.
-
Toronto and the Greater Toronto Area, including Mississauga, Brampton, Vaughan, Markham and Oakville. Larger projects elsewhere in Ontario are quoted case by case.
Free site assessment
Get a written quote
Tell us about the space. A project lead replies within one business day to book your site visit.
Call
+1 647-643-4206
Email
info@hardbond.ca
Office
2967 Dundas St W #325D, Toronto, ON M6P 1Z2