Static control

ESD & Anti-Static Epoxy Flooring in Toronto

Static discharge can destroy electronics, ignite dust and solvents, and corrupt sensitive equipment. Hardbond installs conductive and static-dissipative (ESD) epoxy floors for electronics assembly, data centres, labs and hazardous areas, grounded and tested after installation.

ESD floors at a glance

Static control you can measure

An ESD floor is part of a grounding system, not just a coating. Here is what goes into one.

Conductive or dissipative

Conductive floors drain charge fastest; static-dissipative floors slow it down. The right one depends on your equipment and footwear program.

Grounding built in

A conductive primer and copper grounding points connect the floor to building ground before the topcoat goes down.

Polished concrete floor in a racked Toronto distribution warehouse
Commercial epoxy flooring installed at a Toronto venue

Tested at handover

Resistance is measured across the finished floor and recorded, so your quality team has the numbers on file.

Where it is used

Electronics assembly, data and server rooms, labs and pharma areas, and battery charging zones. See chemical-resistant floors.

High gloss polyurethane floor commercial lobby
Epoxy floor coating being installed by the Hardbond crew

How ESD floors work

A seamless floor that safely drains static

Conductive fibres or fillers in the coating carry charge to a grounding grid tied into the building ground, so people and equipment never build up a dangerous charge.

Conductive

Lower resistance for explosive-risk areas, solvent rooms and munitions or chemical handling.

Static dissipative

Controlled resistance for electronics assembly, server rooms and clean rooms.

Grounded & tested

Copper grounding tied into building ground, with resistance readings recorded after install.

Durable

A seamless epoxy wear surface that takes carts, foot traffic and cleaning.

Specified to your standard

Built to the resistance range you need

We confirm the resistance range your equipment or safety program requires, then select a manufacturer system rated for it. After installation we test the floor and give you the readings for your records.

[Confirm: ANSI/ESD S20.20 or customer standard, and testing method used.]

How a project runs

From site visit to handover

One project lead from the first walkthrough to the warranty paperwork, with the schedule planned around your operations.

01

Site assessment

We walk the space, check slab condition and moisture, and ask about traffic, chemicals and how much downtime you can allow.

02

Written proposal

A fixed quote naming the system, thickness, schedule and warranty, ready for your facility team or GC.

03

Prep & install

Diamond grinding, crack and joint repair, then installation, phased and scheduled for nights or weekends where needed.

04

Walkthrough

Final inspection with your team, care instructions and the warranty in writing.

Why facility teams choose Hardbond

Low risk to hire

A floor that fails costs far more than the floor. Here is what stands behind every Hardbond quote.

WSIB & fully insured

Active WSIB clearance and $5 million commercial liability coverage, sent with every proposal.

Written warranty

A 3-year written commercial warranty, stated in the contract, on every system we install.

No shutdown required

Phased and weekend installs, with overnight work by arrangement, so your floor and your team keep working.

Proven systems

Commercial systems from manufacturers including Sika, Mapei, Ardex, Tremco and Sherwin-Williams, installed to each manufacturer's specification.

Proven on large projects

Recent Hardbond projects

More than 1.1 million sq ft of flooring completed since 2021, for venues, dealerships, clinics and commercial spaces across Ontario and abroad.

60,000 sq ft

Go-kart and anti-slip pedestrian flooring for K1 Speed's indoor karting venue.

St. Catharines, ON · 2025

45,000 sq ft

Polymer flake flooring for a trampoline and entertainment venue.

Scarborough, ON · 2025

15,000 sq ft

Seamless polyurethane flooring for a plastic surgery clinic.

Santo Domingo, Dominican Republic · 2026

1.1M+ sq ft

Commercial and industrial flooring completed since 2021, backed by a written 3-year warranty.

See our projects →

Questions

Before you call

Straight answers to what facility managers ask us most.

Free site assessment

Get a written quote

Tell us about the space. A project lead replies within one business day to book your site visit.

Call
+1 647-643-4206

Email
info@hardbond.ca

Office
2967 Dundas St W #325D, Toronto, ON M6P 1Z2