Chemical resistance

Chemical-Resistant Floor Coatings in Toronto

Acids, solvents, caustics, oils and cleaning chemicals eat through bare concrete and ordinary coatings. Hardbond installs chemical-resistant epoxy and urethane cement systems for manufacturing plants, labs, battery charging rooms, food processing and containment areas across Toronto, the GTA and Ontario.

Matched to the chemical

Tell us what spills, we spec the floor

No single coating resists everything. We match the resin to the chemicals, concentration and temperature on your floor.

Acids

Battery rooms, food acids and plating lines need novolac epoxy or urethane cement.

Caustics & cleaners

Daily sanitizers in food plants and labs.

Polished concrete floor in a racked Toronto distribution warehouse
Commercial epoxy flooring installed at a Toronto venue

Oils & fuels

Hydraulic fluid, brake fluid and gas in auto shops and plants.

Solvents

Print shops and manufacturing need high-crosslink systems. See industrial coatings.

High gloss polyurethane floor commercial lobby
Epoxy floor coating being installed by the Hardbond crew

Matched to the chemicals

Specified against what actually hits your floor

No single coating resists everything. We ask which chemicals, at what concentration and temperature, and how long they sit, then specify a system rated for them.

High-performance epoxy

Dense, non-porous epoxy systems for oils, fuels, many acids and cleaning chemicals.

Urethane cement

For hot washdowns, food acids, thermal shock and aggressive cleaning in food and beverage plants.

Secondary containment

Coated pits, curbs and bund areas around tanks and drums to contain spills.

Battery & charging rooms

Acid-resistant floors for forklift battery charging areas, with optional ESD where required.

Prep makes the difference

Contaminated slabs prepared properly

Chemical-soaked concrete is ground or blasted back to a sound surface before anything goes down, so the new system bonds. See manufacturing flooring, pharma and lab flooring, urethane cement and ESD flooring.

How a project runs

From site visit to handover

One project lead from the first walkthrough to the warranty paperwork, with the schedule planned around your operations.

01

Site assessment

We walk the space, check slab condition and moisture, and ask about traffic, chemicals and how much downtime you can allow.

02

Written proposal

A fixed quote naming the system, thickness, schedule and warranty, ready for your facility team or GC.

03

Prep & install

Diamond grinding, crack and joint repair, then installation, phased and scheduled for nights or weekends where needed.

04

Walkthrough

Final inspection with your team, care instructions and the warranty in writing.

Why facility teams choose Hardbond

Low risk to hire

A floor that fails costs far more than the floor. Here is what stands behind every Hardbond quote.

WSIB & fully insured

Active WSIB clearance and $5 million commercial liability coverage, sent with every proposal.

Written warranty

A 3-year written commercial warranty, stated in the contract, on every system we install.

No shutdown required

Phased and weekend installs, with overnight work by arrangement, so your floor and your team keep working.

Proven systems

Commercial systems from manufacturers including Sika, Mapei, Ardex, Tremco and Sherwin-Williams, installed to each manufacturer's specification.

Proven on large projects

Recent Hardbond projects

More than 1.1 million sq ft of flooring completed since 2021, for venues, dealerships, clinics and commercial spaces across Ontario and abroad.

60,000 sq ft

Go-kart and anti-slip pedestrian flooring for K1 Speed's indoor karting venue.

St. Catharines, ON · 2025

45,000 sq ft

Polymer flake flooring for a trampoline and entertainment venue.

Scarborough, ON · 2025

15,000 sq ft

Seamless polyurethane flooring for a plastic surgery clinic.

Santo Domingo, Dominican Republic · 2026

1.1M+ sq ft

Commercial and industrial flooring completed since 2021, backed by a written 3-year warranty.

See our projects →

Questions

Before you call

Straight answers to what facility managers ask us most.

Free site assessment

Get a written quote

Tell us about the space. A project lead replies within one business day to book your site visit.

Call
+1 647-643-4206

Email
info@hardbond.ca

Office
2967 Dundas St W #325D, Toronto, ON M6P 1Z2