Manufacturing & plants

Industrial Floor Coatings for Manufacturing Plants

Production floors take forklifts, dropped parts, oils, coolants and cleaning chemicals every shift. Hardbond installs high-build epoxy, chemical-resistant novolac and urethane cement systems for plants across the GTA, phased around your production schedule.

Zone by zone

Plant floors specified area by area

Production lines, maintenance shops and shipping each wear a floor differently, so each gets its own system and thickness in your proposal.

Production lines

High-build epoxy or urethane cement for impact, abrasion and dropped parts, with coloured zones for workflow.

Chemical & wash areas

Systems rated for your oils, coolants, acids and cleaners. See chemical-resistant flooring.

Polished concrete floor in a racked Toronto distribution warehouse
Commercial epoxy flooring installed at a Toronto venue

Static-sensitive rooms

ESD flooring for electronics assembly, controls and testing areas.

Safety marking

Aisles, hazard zones and machine guards marked with durable line striping.

High gloss polyurethane floor commercial lobby
Epoxy floor coating being installed by the Hardbond crew

What production floors need

Specified for the abuse your floor actually takes

We look at traffic, chemicals, temperature and cleaning before recommending a system, then put the thickness and cure schedule in writing.

Impact resistance

Thick, high-build systems that take dropped parts, pallet drops and steel wheels without chipping.

Chemical resistance

Novolac epoxy and urethane cement for acids, solvents, oils and caustic cleaners.

Safety marking

Slip-resistant textures, aisle lines, machine zones and hazard marking built into the coating.

Thermal shock

Urethane cement for hot washdowns, ovens and cold rooms that crack ordinary epoxy.

Installed around production

No full shutdown required

We section the plant, coat around fixed equipment, and schedule nights, weekends and planned shutdowns so lines keep running. Every phase and return-to-service time is in your written schedule before work starts.

Surface prep is diamond grinding or shot blasting, with oil-contaminated concrete cleaned and tested before coating.

How a project runs

From site visit to handover

One project lead from the first walkthrough to the warranty paperwork, with the schedule planned around your operations.

01

Site assessment

We walk the space, check slab condition and moisture, and ask about traffic, chemicals and how much downtime you can allow.

02

Written proposal

A fixed quote naming the system, thickness, schedule and warranty, ready for your facility team or GC.

03

Prep & install

Diamond grinding, crack and joint repair, then installation, phased and scheduled for nights or weekends where needed.

04

Walkthrough

Final inspection with your team, care instructions and the warranty in writing.

Why facility teams choose Hardbond

Low risk to hire

A floor that fails costs far more than the floor. Here is what stands behind every Hardbond quote.

WSIB & fully insured

Active WSIB clearance and $5 million commercial liability coverage, sent with every proposal.

Written warranty

A 3-year written commercial warranty, stated in the contract, on every system we install.

No shutdown required

Phased and weekend installs, with overnight work by arrangement, so your floor and your team keep working.

Proven systems

Commercial systems from manufacturers including Sika, Mapei, Ardex, Tremco and Sherwin-Williams, installed to each manufacturer's specification.

Proven on large projects

Recent Hardbond projects

More than 1.1 million sq ft of flooring completed since 2021, for venues, dealerships, clinics and commercial spaces across Ontario and abroad.

60,000 sq ft

Go-kart and anti-slip pedestrian flooring for K1 Speed's indoor karting venue.

St. Catharines, ON · 2025

45,000 sq ft

Polymer flake flooring for a trampoline and entertainment venue.

Scarborough, ON · 2025

15,000 sq ft

Seamless polyurethane flooring for a plastic surgery clinic.

Santo Domingo, Dominican Republic · 2026

1.1M+ sq ft

Commercial and industrial flooring completed since 2021, backed by a written 3-year warranty.

See our projects →

Questions

Before you call

Straight answers to what facility managers ask us most.

Free site assessment

Get a written quote

Tell us about the space. A project lead replies within one business day to book your site visit.

Call
+1 647-643-4206

Email
info@hardbond.ca

Office
2967 Dundas St W #325D, Toronto, ON M6P 1Z2